On March 8, 2019, CCTV news reported the successful operation of 4500 KW Compressor Packages in the Wen 23 Gas Storage Phase I project.  The Wen 23 gas storage facility is the biggest gas storage facility in central-east China with a total storage capacity of 10.4 billion cubic meters. CCPGE has conducted the API 618 pulsation (acoustical), mechanical vibration analysis and torsional vibration analysis of the 6 motor-driven reciprocating compressor packages  for this project,

 

News link: http://tv.cctv.com/2019/03/13/VIDEY8IcLZIfdyXrQGc1f4oL190313.shtml

 

Leave a Reply

Your email address will not be published. Required fields are marked *